Day work sheet guide

What is a day work sheet?

The short version, what to include, and how a day work sheet differs from a job sheet or a timesheet. Some people write it daywork sheet or day worksheet — it is the same record.

Last reviewed: 8 September 2026

Day work sheet — definition

A day work sheet — also written day worksheet or daywork sheet — is a record of the labour, plant or equipment and materials actually used to complete a piece of work. It is commonly used in UK construction and trades when work is valued from the resources used rather than from a fixed price, and it is usually acknowledged on site as a record of what was supplied.

What should a day work sheet contain?

A useful record identifies the job and customer, dates the work, describes what was done, and lists the people, hours, materials and equipment involved. Photographs give both sides something concrete to refer back to.

  • Job reference and site address
  • Customer or main contractor
  • Date and hours worked
  • Each operative and their rate
  • Materials used and quantities
  • Plant and equipment on site
  • Description of the work carried out
  • Photographs as supporting proof

Day work sheet vs job sheet vs timesheet

Difference between a day work sheet, job sheet and timesheet
RecordMain purposeTypical detail
TimesheetRecord time workedPerson, date and hours
Job sheetRecord the whole jobWork done, labour, materials, equipment and proof
Day work sheetEvidence the resources usedLabour, plant or equipment and materials used for the work

Why use an app instead of paper?

Paper day work sheets compared with a mobile app
Paper padDay Worksheet
Where it livesIn the van, until it is lostOn the phone, with the job
PhotosSeparate camera rollAttached to the job record
RewritingCopied out again at homeRecorded once on site
What the customer getsA photo of a paper sheetA branded PDF

Day Worksheet keeps the labour, materials, equipment and photos together while they are being captured, then produces a professional PDF ready to send. The free plan gives you 2 job sheets (watermarked, sending disabled) so you can test it on a real job before deciding.

Common mistakes to avoid

  • Writing it up laterHours and materials get rounded, guessed or forgotten once you have left the site.
  • No acknowledgementFollow the acknowledgement process agreed for the job and keep a dated copy of the record.
  • Vague descriptionsDescribe the task, location and resources so the record is easier to review.
  • Missing plantRecord relevant plant or equipment and the units used, in line with the agreed basis for the work.
  • No photosBefore and after photographs are the easiest way to show the condition you found and the work you left.

Is a day work sheet the same as a day worksheet?

In the trade context covered here, day work sheet, day worksheet and daywork sheet usually refer to the same kind of resource record: the labour, plant and materials actually used on a piece of work. The spelling matters less than the contents, so check what your job actually requires.

Check the rates, required records and approval process agreed for your job. Signing a record does not by itself guarantee payment or satisfy every contract.

A worked example

Here is what a completed day work sheet contains for a single day on site. The figures below are an illustration written for this page — not a real customer job, and not a quote for work. Your own rates and the basis agreed for the job are what count.

Illustrative day work sheet for one day on site
LineRecorded detailBasis
Job and siteUnit 4, Example Trading Estate — drainage investigation, Tuesday 14 April 2026Instructed on site by the site manager
Operative 1Groundworker, 8 hoursHourly rate from your own settings
Operative 2Labourer, 6 hoursHourly rate from your own settings
PlantMini excavator, 1 dayDay rate, recorded with the hire units used
Materials6 m of 110 mm pipe, 2 couplers, 1 bag of pea shingleQuantities as used, not as ordered
PhotographsExcavation before work, exposed pipe, backfilled surfaceUp to four images on the sheet
DescriptionLocated blocked run, exposed and replaced damaged section, reinstated surfaceWritten on site
AcknowledgementSigned on the phone by the site manager before leavingEvidence of acknowledgement, not of payment

Priced out, the same day looks like this. Every rate below is invented for the example; the app uses the rates on your own business profile.

Illustrative costing for the same day (example rates only)
ResourceQuantityExample rateLine total
Groundworker8 hours£32.00 an hour£256.00
Labourer6 hours£24.00 an hour£144.00
Mini excavator1 day£180.00 a day£180.00
110 mm pipe6 m£9.50 a metre£57.00
Couplers2£6.25 each£12.50
Pea shingle1 bag£5.40 a bag£5.40
Day work total before VAT——£654.90

Labour £400.00, plant £180.00 and materials £74.90 give £654.90 before VAT. VAT and CIS are then applied from your own business profile settings, and you check the figures before anything is sent. Recorded this way, the eventual invoice is a summary of a record the customer already acknowledged rather than a figure they are seeing for the first time. A signed record is evidence of acknowledgement; it does not by itself guarantee payment.

A free template to start with

If you want something to use today, there is a free day work sheet template you can print or save as a PDF. No email address, no sign-up.

Less paperwork. Better records.

Finish the job, get paid quicker.

Record the work in one place, then turn the details into professional job sheets and invoices ready to send from your phone. The free plan includes 2 job sheets. They are watermarked and cannot be sent or shared until you upgrade.

QR code linking to the Day Work Sheet listing on the Apple App StoreDownload on the App StoreScan with your iPhone or iPad
QR code linking to the Day Work Sheet listing on Google PlayGet it on Google PlayScan with your Android phone

Download the app, then register inside it. There is no separate website sign-up.